Difference between revisions of "Freehold, Bayonne"

Jump to navigation Jump to search
2,030 bytes added ,  21:05, 10 May 2017
no edit summary
(fix file)
Line 14: Line 14:


In early 2016, construction was slow for both Downtown and the terminal of the airport. The airport then only had a runway and a control tower. February 2016 saw the development of Freehold's suburban district, Dover. Throughout the spring and summer of 2016, construction resumed in Downtown and the last building within the district, Freehold Regional Hospital, was completed on August 31, 2016. The exterior of the airport's terminal was completed on July 20, 2016. Currently, the airport's parking lot and the planned two runways are under construction.
In early 2016, construction was slow for both Downtown and the terminal of the airport. The airport then only had a runway and a control tower. February 2016 saw the development of Freehold's suburban district, Dover. Throughout the spring and summer of 2016, construction resumed in Downtown and the last building within the district, Freehold Regional Hospital, was completed on August 31, 2016. The exterior of the airport's terminal was completed on July 20, 2016. Currently, the airport's parking lot and the planned two runways are under construction.
== Geography ==
Freehold is a peninsula nearly surrounded by the Alga Sea. It's northern border is defined by a 5 meter (16.4 ft.) tall wall, and a line of buoys from the wall to the opposite shore. The eastern, western, and southern borders are unclear, but the east would most likely be defined with the entirety of the Alga Sea, south of the line of buoys, the west defined by the highway connecting Freehold to Budapest, and the south defined from the Olympic Stadium to the eastern edge of the tundra biome, to the Alga Sea. Currently, Freehold does not border any city aside for the city of Minneapolis to the south, and possibly Rhodes, Frank Island, and [[Budapest]] to the north.
== Points of Interest ==
All locations are listed with their date of completion, location according to the street they face or general area's name, and the district they are within (Locations within no district are still within Freehold):
{| class="wikitable sortable"
|-
! Point of Interest !! Date of Completion !! Location !! District
|-
| Freehold City Hall || July 9, 2015 || Freehold Avenue || Capital
|-
| Freehold Lighthouse || August 1, 2015 || Carroll Ave. / Bojack St. || Capital
|-
| Rio Grande Hotel || August 10, 2015 || Freehold Avenue || Capital
|-
| Morgan Trust Center || August 21, 2015 || Mercury St. / Main St. (Route 40) || Downtown
|-
| Clatsop Park || September 1, 2015 || Lewis Lane || Dover
|-
| Bayonne Bridge || November 14, 2015 || Route 40 || Dover
|-
| National Building of Bayonne || January 18, 2016 || Mercury St. / Jackson St. || Downtown
|-
| Burlington Island || March 30, 2016 || Alga Sea || N/A
|-
| Amwell Park || May 2, 2016 || Jackson St. / Dover St. || Downtown
|-
| Peace Memorial of Freehold || June 26, 2016 || Main St. (Route 40) || Downtown
|-
| Protectors of Freedom Memorial || July 5, 2016 || Griffin St. (Route 15) || Dover
|-
| Pier aside the Alga Sea - Freehold || July 6, 2016 || Griffin St. (Route 15) || Dover
|-
| Freehold Olympic Stadium || April 3, 2017 || Olympic Way || N/A
|}
182

edits

Navigation menu