35
edits
The PCB wiki has now been archived and is read-only. |
m (stuff) |
|||
Line 74: | Line 74: | ||
The Metro consists of 7 Lines: The Glenheim Line, The Berri Line, The Bloor Line, The Rosedale LRT Line, the Canada Line, The Olympic Line, and the RER (Park Line). Major Terminal Stations are: City Central, Downtown, and Market Stations. The Metro is open from 5 AM to 1 AM on weekdays and from 11 AM to 7 PM On Weekends. an estimated 600,000 people travel on the metro every day, making it the most used way of transit in the city. | The Metro consists of 7 Lines: The Glenheim Line, The Berri Line, The Bloor Line, The Rosedale LRT Line, the Canada Line, The Olympic Line, and the RER (Park Line). Major Terminal Stations are: City Central, Downtown, and Market Stations. The Metro is open from 5 AM to 1 AM on weekdays and from 11 AM to 7 PM On Weekends. an estimated 600,000 people travel on the metro every day, making it the most used way of transit in the city. | ||
<gallery> | <gallery> | ||
Metro081.jpg| Canada Line platform at Downtown Metro Station | |||
</gallery> | </gallery> |
edits