310
edits
The PCB wiki has now been archived and is read-only. |
Line 418: | Line 418: | ||
==== Current Relations and the Union Bridge ==== | ==== Current Relations and the Union Bridge ==== | ||
Following this, as a sign of goodwill, President _Travis undertook the construction of the Union Bridge, connecting the United Republic at Beechwood and the Padaic Republic by road. This was agreed to by both sides, and the bridge was completed on the 15th of August 2019. Following this, relations between the United Republic and the Padaic Republic are considered friendly. The embassy in Illemont was completed and remains open. | Following this, as a sign of goodwill, President _Travis undertook the construction of the Union Bridge, connecting the United Republic at Beechwood and the Padaic Republic by road. This was agreed to by both sides, and the bridge was completed on the 15th of August 2019. Following this, relations between the United Republic and the Padaic Republic are considered friendly. The embassy in Illemont was completed and remains open. | ||
== Flags of the United Republic == | == Flags of the United Republic == |
edits