Difference between revisions of "United Republic"

Jump to navigation Jump to search
211 bytes added ,  08:26, 25 August 2019
no edit summary
Line 332: Line 332:
==== Current Relations and the Union Bridge ====
==== Current Relations and the Union Bridge ====
Following this, as a sign of goodwill, President _Travis undertook the construction of the Union Bridge, connecting the United Republic at Beechwood and the Padaic Republic by road. This was agreed to by both sides, and the bridge was completed on the 15th of August 2019. Following this, relations between the United Republic and the Padaic Republic are considered friendly. The embassy in Illemont was completed and remains open.
Following this, as a sign of goodwill, President _Travis undertook the construction of the Union Bridge, connecting the United Republic at Beechwood and the Padaic Republic by road. This was agreed to by both sides, and the bridge was completed on the 15th of August 2019. Following this, relations between the United Republic and the Padaic Republic are considered friendly. The embassy in Illemont was completed and remains open.
==== Return of Usonia ====
On 25 August 2019, the founder of Usonia Wolfyyyyyyyy returned after a short absence. Upon his return, under his direction, the state and city of Usonia rejoined the United Republic.


== Flags of the United Republic ==
== Flags of the United Republic ==
310

edits

Navigation menu